Since the City assumes no responsibilities in alleys, the Street Department has no Alley Program. The Street Department does however answer Citizen Requests.
The City assumes responsibility for maintaining alley entranceways (that part of the alley which runs from the curb face on the adjoining street to the end of the curb return that goes into the alley, which is generally the right of way line). It DOES NOT assume responsibility for the alley itself.
Alley Entrances
This Street Department does assume responsibility for potholes in alley entrances. There are three types of alley entrances:Unimproved Alleys
After the gravel is purchased, the work is done within ten (10) working days. However, weather, and higher priority work could delay the schedule.
Minimum gravel tonnage: The Street Department will haul eight (8) tons of gravel. Call 271-4848 to make a request for your alley.
After the gravel is purchased, the work is usually scheduled within ten (10) working days. However, weather and higher priority work could delay the schedule.
Minimum gravel tonnage: The Street Department will haul a minimum of eight (8) tons of gravel. To request maintenance for your alley, call 271-4848
Improved Alleys
Improved alleys are those alleys that have either an asphalt or a concrete surface. The Street Department does provide the service of patching concrete and asphalt alleys using City staff and equipment if the following criteria are met:
The area of repairs needed over the entire alley surface CAN NOT EXCEED 20% of the total alley pavement area. If the scope of the repairs is larger than either 16 ton or 20% of total pavement area, the work would significantly defer resources from the Street Departments higher priority of Street Maintenance and cannot be done.
A Citizen living adjacent to the alley must make a request for repairs to the Street Department, by calling 271-4848. A Street Department Supervisor will measure the length and width of the alley, then measure the needed areas of repair. If the area to be repaired (in square yards) does not exceed 20% of the total alley surface, the Street Department will make the necessary repairs. Additionally, the total volume of asphalt mix should not exceed sixteen (16) tons.
The Property owner will be contacted and told how much asphalt they will need to purchase to make the repairs. The Property Owner must pay for the asphalt at one of the local asphalt plants before the Street Department will schedule the work. Work is usually done within ten (10) working days of purchase of the materials. However, weather, and higher priority programs could delay the schedule.
NOTE: If an overlay of the entire alley surface is needed, it would be entirely at the Property owners cost to hire a contractor directly or pay the cost for the City to contract for these services. The Street Department DOES NOT PLACE OVERLAYS.