Southwest Parkway North - 28th/Commercial to 22nd St.
Facts:
Map of Trail
Length- .6 miles
Facility - 10’ concrete trail
Users - walk, run, bike, skating, skateboards, wheelchairs, strollers and other non-motorized modes; no horses or gasoline powered vehicles
Difficulty - Flat; Little difficulty
|
Fun For Any Interest...
This segment of the Urban Trail begins at the Chicago & Rock Island stretching station and connects to Phil Welch Stadium (home of the St. Joe Saints), Bode Ice Arena, Extreme Skating, and Summer Jam Basketball Courts.
|
Click Images to Enlarge
|
| |
 |
| |
 |
Connecting Neighborhoods ...
The Bode Sports Complex is a tremendous asset for residents of the region. Stroll or bike by any time and you will likely see some activity. Neighborhoods are connected to the recreational facilities at this location from throughout the community
|
 |
| |
 |
| |
 |
End of the Trail-For Now ...
This section of the Urban Trail ends near Drake Field, at 22nd Street. The segments of trail between this point and Mansfield Road, along Southwest Parkway, are currently under design and is anticipated to begin construction by 2007. For now, this is the end of trail - Southbound.
|
 |